Fire Safety Requirements for Exhibition Booths and Mall Events: A Complete Guide to Fire-Safe Materials, FS251, Venue Rules and Countdown Timeline for Exhibitors and Booth Contractors

Exhibition booths have short design cycles and tight build-up schedules. Exhibitors and booth contractors tend to focus on visual impact and product display, leaving fire-safe material requirements until last. As a result, they discover only a day or two before move-in that timber structures, back panels or fabric backdrops lack documents, scramble to find someone to treat them, and sometimes cannot open on time. This guide sets out the common requirements for exhibition booth fire safety from Hong Kong exhibition venues, organisers and temporary licences, and provides a countdown timeline starting three months before opening to help exhibitors and booth contractors prepare early.

Quick answer: Major exhibition venues in Hong Kong generally require all booth construction and decoration materials, including timber structures, back panels, fabric backdrops, banners, carpets and ceiling coverings, to be non-combustible, inherently non-flammable or durably flameproof. Booth ceiling materials must also be water-permeable. Materials that cannot be shown to comply must be treated by a Class 2 Registered Fire Service Installation Contractor with a fire retardant paint or solution accepted by the Director of Fire Services, and an FS251 submitted before the organiser's deadline. Fabric ceilings usually need to be submitted to the venue in advance for approval or testing, and some exhibitions require details three months ahead.

Contents

  1. Who needs to handle booth fire-safe materials
  2. Venue and organiser fire safety rules
  3. Requirements for different booth types
  4. Booth materials, item by item
  5. Special requirements for fabric ceilings
  6. Other safety documents besides the FS251
  7. Countdown timeline before opening
  8. Mall events and pop-up stores
  9. Four common scenarios
  10. Frequently asked questions

1. Who Needs to Handle Booth Fire-Safe Materials

Several parties are involved in booth fire-safe materials, and unclear responsibilities are the main cause of delays:

RoleMain responsibilities
ExhibitorBears ultimate responsibility for booth safety, ensures the appointed booth contractor follows organiser and venue rules, and submits documents on time
Booth contractorSelects compliant materials, arranges fire retardant treatment, collects test reports and certificates, and submits them as the organiser requires
Class 2 Registered Fire Service Installation ContractorTreats non-compliant materials with products accepted by the Director of Fire Services and issues the FS251
OrganiserIssues exhibitor circulars, sets document deadlines and collects supporting documents
Venue operatorSets venue rules, approves special items such as fabric ceilings, and has the right to inspect materials
Government departmentsThe Fire Services Department (FSD) and relevant licensing authorities may inspect to verify that materials comply

Note that even if the booth contractor handles everything, the exhibitor remains responsible for booth safety. When appointing a contractor, state in the contract who is responsible for fire-safe materials and the FS251, and what happens if they are not submitted on time.

2. Venue and Organiser Fire Safety Rules

Core Requirements in Venue Rules

Taking the exhibition rules of a major Hong Kong convention and exhibition venue as an example, all materials used for booths, temporary structures, stages or other exhibition installations, including drapes, curtains, fabrics, signs, fascia boards, decorative materials, backdrops, banners, coverings, plastics, skirting, carpets and other materials, must be non-combustible, inherently non-flammable or durably flameproof. Booth ceiling materials must also be water-permeable. Authorised venue or government staff have the right to inspect these materials, and the venue may prohibit certain materials and finishes if it has safety concerns. If the venue requests, exhibitors must provide documents for the fire tests, burning tests, smoke tests and other tests required by the relevant legislation.

What Organiser Circulars Typically Say

Circulars sent by organisers to exhibitors usually restate these requirements under the venue rules and add the following:

Temporary Places of Public Entertainment Licence Requirements

Some exhibitions, trade fairs or events require a Temporary Places of Public Entertainment Licence. Its conditions generally prohibit readily combustible decorations. For custom-built booths using combustible materials for false ceilings, partitions, wall finishes, drapes or curtains, these must meet a standard accepted by the Director of Fire Services, or be treated with a fire retardant paint or solution accepted by the Director, with an FS251 submitted by a Class 2 contractor as proof of compliance. The organiser then forwards it to the FSD.

Keeping Fire Service Installations Clear

Venue rules also require booth layouts not to obstruct the venue's fire service installations. For example:

3. Requirements for Different Booth Types

Booth typeCommon materialsFire-safe material focusOther documents
Standard booth (provided by organiser)System panels, standard fascia, carpetMaterials supplied by the organiser are generally already treated; decorations added by the exhibitor must still complyDepends on what is added
Modified standard boothStandard structure plus timber back panels, fabric backdrops and decorationsAdded timber and fabric must have test reports or be fire retardant treatedFS251 (if treated)
Custom-built boothExtensive timber structures, plywood, fabric backdrops, light boxes, raised platformsAll combustible materials must be proven compliant or treated, with an FS251 submittedStructural Safety Certificate, FS251, WR1
Double-deck boothMore complex structure with an upper platformSame material requirements as custom-built booths, plus fire extinguishersStricter structural document requirements

Exhibitors who add back panels, fabric backdrops or decorations to a standard booth themselves often overlook them, assuming "the organiser's booth already complies". In fact, the added parts must also meet the requirements.

4. Booth Materials, Item by Item

Timber Structures and Plywood

The main structure of custom-built booths is usually plywood and timber battens, which are typical combustible materials. Because booth materials are mostly prefabricated in a workshop, the ideal approach is to complete fire retardant treatment in the workshop before spraying paint or applying finishes. If already-painted boards are only treated on site, the product struggles to adhere, affecting both the result and the certificate.

Backdrops and Light Boxes

Backdrops made of timber or combustible boards must be treated in the same way. Light box fabrics and printed fabrics should be chosen from materials that already have flame retardancy test reports, as printed fabric is not necessarily suitable for fire retardant solution treatment afterwards.

Fabric Backdrops, Banners and Skirting

Fabrics must be inherently non-flammable or durably flameproof. Ask suppliers for test reports when purchasing. Ordinary fabrics must be treated with fire retardant solution. Waterproof fabrics are generally unsuitable for fire retardant solution treatment, so switch to fabrics with flame retardancy reports instead.

Carpets

Carpets laid by the booth itself are also covered by the rules. Choose exhibition carpets that already have flame retardancy reports, or confirm the treatment method before laying.

Plastics and Decorative Items

Plastic decorations, artificial flowers, paper products and similar items are also "decorative materials" covered by the rules. When used in quantity, confirm their burning performance to avoid being asked by venue staff to remove them.

MaterialRecommended approachCommon problem
Plywood, timber battensTreat during workshop prefabrication, before spray paintingDiscovered on site already painted and impossible to treat
BackdropsUse flame retardant boards or treat before paintingTreated only after graphics are applied
Light box fabric, printed fabricUse materials that already have flame retardancy reportsCannot be treated after printing
Fabric backdrops, skirtingUse flame retardant fabric or treat with fire retardant solutionWaterproof fabric is unsuitable for treatment
CarpetsUse flame retardant exhibition carpetOrdinary carpet bought by the exhibitor
Plastic decorationsLimit quantities and confirm burning performanceRemoval required on site

5. Special Requirements for Fabric Ceilings

Booth ceilings are one of the items venues control most strictly, because they directly affect the venue's automatic fire alarm and sprinkler systems. Taking the rules of a major convention and exhibition venue as an example:

Organiser circulars may also require that, whether the fabric ceiling covers part or all of the booth, the booth contractor completes a fabric test application form and submits it with a 1 m × 1 m fabric sample to the venue operator at least one month before opening for fire and water-permeability testing.

In other words, fabric ceilings need far more preparation time than ordinary fire retardant treatment. If the design includes a fabric ceiling, settle the fabric early in the design stage and allow time for testing.

6. Other Safety Documents Besides the FS251

Custom-built booths generally need to submit the following documents in addition to the FS251:

DocumentPurposeResponsible party
FS251Proves that combustible materials have been treated with accepted products by a Class 2 registered contractorClass 2 Registered Fire Service Installation Contractor
Structural Safety CertificateProves that the booth structure is stable and safeAuthorized Person or Registered Structural Engineer (depending on requirements)
WR1 (Work Completion Certificate)Proves that the booth's electrical installation has been installed, inspected and tested as requiredRegistered Electrical Contractor
Test reportsProve that materials already meet fire safety standardsMaterial supplier

Some organisers require the structural design of custom-built booths to be verified for stability by an Authorized Person or Registered Structural Engineer, who issues a Structural Safety Certificate on completion. Requirements are usually stricter for taller or double-deck booths. Deadlines for each document may differ, so always follow the organiser's circular.

Consequences of Missing the Deadline

Failing to submit the FS251 and other documents on time may result in the organiser or venue refusing power supply, requiring non-compliant parts to be altered or removed, or in serious cases affecting the booth's opening. Because the deadline is usually on the last move-in day, there is very little time to put things right once it is missed.

7. Countdown Timeline Before Opening

TimingExhibitorBooth contractor
3 months before openingRead the organiser's circular and confirm the booth type and document requirementsStart design; if there is a fabric ceiling, settle the fabric and prepare the submission
2 months before openingConfirm that the booth contractor's contract sets out responsibilities for fire-safe materials and documentsFinalise the material schedule and request test reports from suppliers
1 month before openingConfirm that the fabric ceiling has been submitted for approval or testingSubmit fabric samples (if required); book a Class 2 registered contractor
2 to 3 weeks before openingFollow up on document progressConfirm the fire retardant treatment date; start workshop prefabrication
1 to 2 weeks before openingConfirm who is responsible for each documentComplete fire retardant treatment before spray painting or applying finishes
During move-inConfirm that documents have been submittedBuild on site; keep fire service installations clear
Before the specified time on the last move-in dayConfirm that the organiser has received the FS251Submit the FS251, Structural Safety Certificate and WR1
During the exhibitionKeep copies of documents ready for inspectionDo not add untreated materials to the booth

Fire retardant treatment generally needs to be booked about 2 to 3 weeks in advance. In peak exhibition season, several shows run at the same time and contractors' schedules are tight, so the earlier you book the better. For the work steps, see The Fire Retardant Paint Process Explained: 12 Steps to FS251.

8. Mall Events and Pop-Up Stores

Mall atrium events, pop-up stores and temporary sales fairs have much in common with exhibition booths, but their requirements come from different sources:

Pop-up stores often have only a few days for fitting-out, with timber structures and fabrics mostly prefabricated in a workshop. As with exhibition booths, fire retardant treatment should be completed at the prefabrication stage, with time allowed for the certificate.

9. Four Common Scenarios

Scenario 1: A Start-Up Exhibiting for the First Time

Situation: rents a standard booth and adds timber back panels and fabric decorations itself.
Key points: the additions are outside the organiser's materials, so the exhibitor must provide its own proof.
Recommendation: choose fabrics that already have flame retardancy reports wherever possible, and have the booth contractor treat the timber back panels before painting and obtain an FS251.

Scenario 2: A Large Custom-Built Brand Booth

Situation: a custom-built booth of about 100 m² with a fabric ceiling, light boxes and multi-level display platforms.
Key points: the fabric ceiling must be submitted for approval in advance, and continuous coverage must not exceed 100 m². A Structural Safety Certificate, FS251 and WR1 must also be submitted.
Recommendation: settle the fabric and submit its details three months before opening, and draw up a document list for each type of material with a named person responsible for each.

Scenario 3: A Booth Reused Every Year

Situation: a brand reuses last year's booth structure, updating only the graphics and some back panels.
Key points: after transport, dismantling, reassembly and refurbishment, the old structure's fire retardant treatment may have been affected. New back panels and new printed fabrics need separate proof.
Recommendation: assess reused materials before each show, and confirm that the FS251 covers the materials actually used this time.

Scenario 4: A Mall Atrium Pop-Up Event

Situation: a three-day brand pop-up built with timber structures and fabric backdrops.
Key points: it must meet both the mall management's rules and the relevant licence requirements.
Recommendation: first obtain the mall's event guidelines, confirm the document list and deadlines, and then arrange fire retardant treatment.

Booth Contractor Fire-Safe Materials Checklist

Item to checkConfirmed
The organiser's circular has been read and all document deadlines noted□
All timber structures, back panels, fabrics, carpets and decorative materials have been listed□
Test reports have been obtained from suppliers and checked□
The fabric ceiling has been submitted for approval or testing (if applicable)□
The booth has no solid or rigid ceiling□
Non-compliant materials were treated by a Class 2 contractor before spray painting or finishing□
The FS251 covers all treated materials□
The Structural Safety Certificate and WR1 have been arranged (if applicable)□
The booth layout does not obstruct the venue's fire service installations□
Required fire extinguishers are in place (if applicable)□

For cost factors in booth fire retardant treatment, see How Much Does Fire Retardant Paint Cost in Hong Kong?. For material standards, see BS 476 Part 7 Class 1 vs Class 2. For fire retardant paint basics, see What Is Fire Retardant Paint?.

10. Frequently Asked Questions

Do exhibition booths always need fire retardant paint?

Not necessarily. If booth materials are non-combustible, inherently non-flammable or durably flameproof, with relevant test reports, the reports can serve as proof. Only materials that cannot be shown to comply must be treated with fire retardant paint or solution by a Class 2 registered contractor, with an FS251 submitted.

When must the booth FS251 be submitted?

The deadline is set by the organiser, usually before a specified time on the last move-in day. Always follow the exhibitor circular issued by the organiser and allow enough time for treatment.

Can a booth have a ceiling?

Major convention and exhibition venues generally do not allow solid or rigid ceilings, but they do allow lightweight, fireproof and water-permeable fabric or non-combustible wire mesh as ceiling coverings. Fabric ceilings must be submitted in advance for approval or testing, and continuous coverage generally must not exceed 100 m².

How early should a fabric ceiling be prepared?

It depends on the venue and organiser. Some venues require fabric details to be submitted for approval three months in advance, while some organisers require a 1 m × 1 m sample to be submitted for testing at least one month before opening. Settle the fabric early in the design stage.

Do standard booths need to submit an FS251?

Standard booth materials supplied by the organiser are generally already treated. However, if the exhibitor adds timber back panels, fabric backdrops or decorations, the additions must meet fire safety requirements, and an FS251 must be submitted if they are fire retardant treated.

What documents does a custom-built booth need?

Generally an FS251, a Structural Safety Certificate and a WR1 Work Completion Certificate, with material test reports kept as required. Actual requirements follow the organiser's circular.

Does a booth structure reused from last year need retreating?

After transport, dismantling, reassembly and refurbishment, the old structure's fire retardant treatment may have been affected, and newly added back panels and fabrics also need separate proof. Assess before each show and confirm that the certificate covers the materials actually used this time.

What happens if the FS251 is not submitted on time?

The organiser or venue may refuse power supply or require non-compliant materials to be altered or removed, and in serious cases the booth's opening may be affected. As the deadline is usually on the last move-in day, arrange things early.

Do mall pop-up stores also need proof of fire-safe materials?

Most malls have their own event and fitting-out guidelines, which generally require proof of fire safety for decorative materials. If the event is a temporary place of public entertainment, it must also meet the relevant licence requirements.

Booth Fire Retardant Treatment and FS251

Grand United Eng., Co. is a Registered Fire Service Installation Contractor in Hong Kong. We assess booth materials for exhibitors, booth contractors and event companies, arrange fire retardant treatment at the workshop prefabrication stage, and submit the FS251 in line with organiser deadlines. When you contact us, please provide the exhibition name and dates, booth area, design drawings, material schedule and organiser circular. You can also browse our Fire Engineering Services, Project Cases and FAQ.

Book booth fire retardant treatment, or call 2667 7701.