The present document isFAQsA detailed version of the page: The same issue is to make it clear that legislation is based, process timelines, division of labour and fees, so as to facilitate the master ' s, legal corps, management companies and businessmen in the first place, refurbishment, acceptance inspection or annual inspection. All legislation is collated by existing regulations, Fire Services Department codes and official disclosures; The determination involving individual sites is recommended to pre-position the site survey.
I. Issues related to start-up and renovation
Is it necessary to do so?
There is no fixed list applicable to all shops, depending on the type of property industry, size, use and the nature of the building. General shop usual devices include:
- fire alarm devices: Smoking or heat detector, mobile fire alarms (shaft glass devices), fire alarm bell.
- emergency lighting and exit sign: Ensure that lighting and direction are still in place at the time of power cuts.
- Shand fire extinguisher: Appropriate quantities and types of configuration by area and risk type.
- fire hose reel: Partial commercial services are required to be established.
- Flame access: The maintenance of complicity shall not be blocked by the goods or stereotypes.
- fire door from fire prevention:: Establishment and maintenance of self-imposed closure functions in accordance with building design requirements.
Additional considerations in special industries
- restaurant with food premises: Automatic fire-fighting systems (protection of pumps, winds and helmet areas), fire safety requirements for gas and ventilation systems, automatic cessation facilities for mechanical ventilation systems, fire blanket, and wet chemical type fire extinguisher (European standard F, United States standard K). Open kitchens need to be evaluated together with sprinkler protection.
- beauty salon , massage establishment- The number of closed rooms, with particular attention to the spectacularity, evacuation instructions and escape routes.
- Retail shop: The sprinkler head, direction lamp or blocking fire extinguisher and the cargo.
- Education centres and tutors- Cooperation with fire service installations and evacuation arrangements as required by the relevant registered or issued department.
In the case of designated commercial offices or commercial buildings, it may be regulated by the Safety (Commercial Office) Regulations (Chapter 502), which cover, for example, banking, off-site projection, jewellery or gold operations with security zones, supermarkets, supermarkets or consortia and business sites, and buildings or parts thereof with a total floor area of over 230 square metres; Projects that are often required to provide or improve include automatic spraying systems, automated stopping facilities for mechanical ventilation systems, fire safety and shrimp systems, hand-held fire warnings and handcuff fire extinguisher. The determination cannot be based on the age of the building if it is to look at its use and the nature of the building.
The most effective point of time isUnsigned leases and unfinished road mapBefore. It is still possible to adjust the flowers, spacing, signboarding and bathroom pumps at this time; The time spent was left to be sealed and often recycled. Referencefire protection system design services。
Would the refurbishing be followed by a fire protection system change?
Changes to cover any of the following must be addressed: astronomy height or changes in form (impact sprinkler head cover), pacing or rooms (effect detection coverage and sound chickens), modification of wind tubes (possible fire safety piping conflict or impact on ventilation), new plates or plutonium ( ⁇ sprinkler head with exit sign), change of purpose density (which may trigger re-testing water and evacuation design). Relevant processes and correct sequencesfire protection system change。
How long are fire engineering needed?
The time is comprised of three paragraphs: the previous programme and plan identification, construction and testing and certification or acceptance inspection arrangements. The actual length of time depends on the nature of the work (a significant gap between single system maintenance and overall new fillings), the availability of documentation, the need for other sectors to cooperate (e.g., in connection with the retraction of government water pipelines), the supply of materials, and the duration of the construction (which can only be performed at night).
With regard to the acceptance of new buildings, official time frames are available: Fire Services Department was established on 13 March 2025 to establish a one-stop acceptance inspection office for new fire safety facilities with the aim of reducing overall acceptance of regular projects of general construction size from 52 work days to 35 working days and public housing projects to 22 working days. See below for further detailsAcceptance inspection and certificate。
The shortest period of work was rolled out with the start of the business day. If the acceptance inspection or test found non-compliance, it would be necessary to amend and cover time, leaving the buffers much more cheaper than ex post facto.
II. Contractor ' s qualifications and level
Would it be necessary to hire a registered fire service installation contractor?
In accordance with the fire safety (instructions and equipment) Ordinance (chap. 95B), non-registered contractors are not allowed to install, maintain, repair or inspect fire service installations or equipment at any place. In other words, the registered contractor must be appointed:
- Newly loaded or modified any fire service installations (fire alarm, sprinkler, emergency lighting, copper, etc.).
- FS251 Certificate of Fire Service Installations and Equipment.
- Repair of damaged or ineffective fire service installations.
- Compliance with the fire safety direction issued by the Fire Services Department or by the Board of Tenure.
- licence The fire service installations required to apply for works and certificates.
Class 1; Class 2; Class 3 contractor (RC1/RC2/RC3) is responsible for each of them?
Under fire safety (container) Ordinance (chap. 95A), Class 3:
| Level | Quorum | Common systems |
|---|---|---|
| Level 1 (RC1) | Devices, maintenance, repairs and inspection of electrical or other instruments to detect smoke or fire, and fire service installations or equipment (except hand-held equipment) that would alarm or otherwise issue warnings | fire alarm system, cigarettes and heat detector, mobile alarms, fire alarm bell |
| Level 2 (RC2) | Devices, maintenance, repair and inspection of fire service installations or equipment (except hand-held equipment), including plumbing and fittings designed or modified for the transmission of water or other fire extinguishers, or other types of electrical devices specified in step 1 | automatic sprinkler system, fire safety tumours and copper, fire pump and pressure, gaseous fire suppression system plumbing, automatic fire extinguishing systems, smoke-free systems |
| Level 3 (RC3) | Maintenance, repair and inspection of hand-held equipment | Fire extinguisher, fire blanket |
There is a common misunderstanding that gaseous fire suppression system is subsumed into level 1. The gas system involves the transmission of plumbing and accessories for fire extinguishers, which is covered by level 2; Its detection and association component relates only to level 1. For a complete descriptionfire safety knowledge: RC1/RC2/RC3 division of labour。
How can the contractor verify its eligibility for registration?
(b) List the full range of installations at the site and determine the level to be required against the above table; The contractor ' s registration level and status were then checked to the Fire Services Department, which requested the other party to produce the registration information. If the system category exceeds its level of registration, it may not be accepted for this part of the work and certificate, nor will there be a gap in the annual inspection record.
III. Owners ' and tenant responsibilities
Is the tenant or owner responsible for fire engineering?
Two layers of shilling:Legislation responsibilities(b) The owner of fire service installations and equipment, who is required to keep the devices in an effective operational condition and at least once every 12 months is inspected by a registered fire service installation contractor;Contractual responsibilityThis is divided by lease. The terms of the lease only bind both parties to the contract and did not alter the legislative responsibilities.
| Item | Who is substantively responsible |
|---|---|
| Buildings, corridors, cantonal alarm and lighting devices | Business Corps or Property Management Corporation |
| Houses, public keys, public sprinkler system | Corps or Management Corporation |
| Structural fire prevention facilities in buildings (fire door, fire-fighting separators, friction routes) | Owners or legal missions |
| Observance of fire safety direction improvements | Owners or legal missions (as directed) |
| Additional units in the unit as a result of refurbishment or operation | Tenant or operator |
| Storage fire extinguisher configuration and annual inspection | Tenant or operator |
| Certificate of fire safety required for application | licence applicant |
| Maintenance devices are not hanged and not damaged | Actual users |
Recommendations to be made prior to signatureAnnex to the list of devices(a) The name, location, quantity and responsible of the device shall be specified on a case-by-case basis, each of which shall have one copy; The next annual inspection, remedial work and handover are the same. A list of the elements of the lease clause and the interface check is availableSubstantive guidance on scope of services。
IV. Plans and construction
Would fire safety plans differ from construction?
The plans are the basis for design and construction is carried out on a map basis, which must be consistent.
Plans
- Determination of the location, specifications, quantity and piping route of fire service installations.
- The applicable rules and codes, such as the Fire Services Department ' s Minimum fire service installations and equipment code, must be met.
- Construction plans involving new or modified buildings are generally submitted by Authorised Person (AP) to the relevant authorities; After the approval of the plans by the Department of New Engineering, Authorised Person was informed that he received a certificate of fire safety from the construction plan (F.S. 161).
Construction phase
- A registered fire service installation contractor at the appropriate level is installed in accordance with confirmed plans.
- Use of products and materials that meet the specifications, and retention of product certification or endorsement documents.
- Part of the work must be accompanied by requests from other departments, such as a notification of completion of water supply equipment in connection with the removal of government water pipes or part IV of the Water Authority ' s table WWO46.
- Post-completion arrangements for testing and acceptance inspection.
Incompatibility with the plans is one of the most common reasons for acceptance inspection failure. If changes are found during the construction period, the plans and specifications should be updated rather than completed before they can be filled.
What forms are FSI/314C?
FSI/314C is the caveat of fire service installations plans for buildings in integrated-purpose buildings/occupation buildings, which results in Fire Services Department chiefs (operators: building improvement courses), signed by the contractor or consultant of the fire service installations plan to demonstrate that the details and specifications of all fire service installations are in accordance with the Fire Services Department ' s minimum safety (e.g., fire safety building) regulations and related services rules Automatic sprinkler appliance rule.
It is not intended that all shop renovation works will be subject to approval forms, but rather to the integrated use and residential buildings regulated by the Safety (Buildings) Regulations. Different forms are required for different projects and it is appropriate to identify the type of case in which you belong.
Can the plans be changed once they have been confirmed?
The principle is that construction must be consistent with the plans. Minor adjustments (e.g. replacement of equipment with the same specifications, without compromising the location of coverage) should be made to confirm acceptance; The revised plans and documents should be resubmitted in relation to substantive changes, such as increases and reductions in the number of equipment, changes in system design or change of installation location. Unconfirmed self-regulation may result in acceptance inspection not adopting, delaying business or affecting licence applications.
V. Acceptance inspection and certification
Fire safety acceptance inspection processes and time frames for new buildings?
Fire Services Department was established on 13 March 2025 to establish a single-stop acceptance inspection office for the construction of new fire safety facilities (Operational Safety Acceptance Inspection), which is streamlined through science and technology applications, forward coordination and processes with the aim of reducing overall acceptance inspection time for regular projects of general building size from 52 work days to 35 working days, public housing projects to 22 working days. As at 31 December 2025, 153 regular projects and 11 public housing projects completed the acceptance inspection within a specified time frame, reaching a target rate of 100 per cent. The Office also has a dedicated e-mail and hotline (offa@hkfsd.gov.hk, 3961 5000).
Internal procedures for inspection and issuance
- Authorised Person submitted an application (FSI/501 and FSI/501a), accompanied by documents such as a map of fire service installations on the building or a physical plain (FSI/314).
- Fire Services Department collects documents and arranges initial inspections within 15 working days of receipt of applications.
- The inspection checked whether fire service installations were emplaced in accordance with approved construction plans and field testing.
- If non-compliance is found, a fire service installations inspection report (FSI/507B) will be issued.
- Authorised Person is required to apply in writing for a review within two months and to arrange follow-up.
- Fire Services Department sends FS 172 (Government buildings) to non-governmental buildings within 7 working days, after full compliance with fire safety requirements.
The certificate shall be valid until the permanent and sufficient water supply provided by AFWR has been taken over at fire service installations.
FS172, FS251 and F.S. 161 respectively?
| Documentation | Use | Who will handle |
|---|---|---|
| FS 172 | New building fire service installations and equipment acceptance inspection certificates; Acceptance inspection under Section 21(6)(d) of the Buildings Ordinance (Chapter 123), relating to the issuance of occupancy permits | Authorised Person submitting application, Fire Services Department |
| FS 251 | Certificate of Fire Service Installations and Equipment ; Delivery after completion of installation, maintenance, repair or inspection for the required annual inspection and licence submission shall be sent within 14 days to Fire Services Department | registered fire service installation contractor issued and delivered |
| F.S. 161 | (b) Certificate of fire safety in construction plans; Authorised Person, approved by the Fire Services Department ' s new engineering department, is the documents for the approval phase of plans | Authorised Person |
Frequent misuse is to open the food premises for FS161 or FS172 to apply for a licence. The licence is generally required to submit a copy of FS251 issued by the registered fire service installation contractor, partially in accordance with the security certificate (FSI/314A or FSI/314B) and a test report or statement for an independent battery emergency lighting system. For further detailsPlace fire safety arrangements。
What is the acceptance inspection unsatisfactory?
Fire Services Department will send a report on the non-compliance identified during inspections (FSI/507B). The steps were to reconcile defects on a case-by-case basis with the contractor, arrange amendments, retest, apply in writing within two months and issue a certificate after adoption. Common reasons for inequity include:
| Shortcomings | Orientation |
|---|---|
| Installation sites are not in line with plans | Re-insertion by plan or prior updating of plans |
| Insufficient number of equipment | Complementing and updating the list of devices by specifications |
| Water pressure or underflow | Screening of boxes, plumbers and pipes, adaptation or repair |
| Detection or alarm test failure | Inspection of back-to-back points and replacement of failure components |
| Emergency lighting maintenance time | Replacement of batteries or lamps |
| Use of non-compliant products | Replacement of products that meet specifications and have authenticated documents |
Case type and construction coordination approachproject examples: acceptance inspection and certification process。
VI. Maintenance and FS251 annual inspection
How long does the fire protection system need to be examined?
(a) The owner of fire service installations and equipment is required to remain in an effective operational condition at the time of the installation, as stipulated in the fire safety (instructions and equipment) Ordinance (chap. 95B), and to be checked at least once every 12 months by a registered fire service installation contractor; The contractor is required to issue FS251 and send a copy to Fire Services Department within 14 days of completion of its work, and failure to comply with the statutory requirements may be prosecuted.
In the area of fire extinguisher, according to the Fire Services Department ' s Code of Conduct for Inspection, Testing and Maintenance of Minimum Fire Service Facilities and Equipment, such fire extinguisher should be tested every 12 months,All fire extinguisher must be tested for pressure within five years。
Please note that FS251 is the plutonium certificate issued by the contractor and not the annual inspection report submitted by the owner; The five-year pressure test error of fire extinguisher should also not be counted as ⁇ 5 to 10 years filled or replaced.
Suggested internal inspection festivals (without replacing statutory annual inspection)
| Frequency | Self-examination of projects |
|---|---|
| Week | (b) The tune of the fire route and exports; No door was roof; fire extinguisher and whether the goods were prior to his leg |
| Monthly | fire extinguisher pressure sheet and appearance; Exit sign writings; alarm No malfunction lamps on mainframe |
| quarterly | emergency lighting functional testing; Visual inspection of the bathroom; sprinkler head was refurbished |
| Annual (statutory) | Weekly annual inspection, remedial work and review by registered contractor and issuance and electronic submission FS251 |
| Within 5 years | Shand fire extinguisher pressure test |
FS251 How do it present? Is the paper available?
It is not possible. Fire Services Department ⁇ Certificate of Fire Service Installations and Equipment (FS251) Online Transmission System, which operates on 1 April 2019 and is fully electronic as from 1 July 2026: the contractor enters the building address, type of devices, inspection results, damage and repairs within the system to facilitate smart or Hong Kong e-mail certificate with an electronic counterfeit certificate. Fire Services Department also expanded the size of the annual inspection checklist by about three times, covering approximately five active contractors. The owner shall request copies of the electronic certificate from the contractor for archiving.
How does the annual inspection identify defects ( remedial work) address?
Commonannual fire safety inspection remedial workThe projects include fire extinguisher switching or replacement, retroactive stress testing, repair of fire alarm bell and detectors, clean-up of accumulating to reduce errors, replace sprinkler head, replacement of emergency lighting batteries and exit sign, repair of lithium and water pressure. The practice is to divide the defects into immediate and rescheduled projects, and to issue FS251 reflecting the actual situation after completion of repairs and review.
The defects were not repaired and qualified records were issued without guarantees to the owner: once the fire or the inspection failed, responsibility was still personal.
VII. " Composition ofation and fees
How do the cost of fire engineering be calculated?
Hong Kong does not have a uniform price list, and any offer of a price for all fire safety should be clearly asked. The costs are generally composed of the following:
- Programme and plans: Conformation of the installation, location and pipe route, documentation requirements.
- Materials: By product type, specifications and quantity.
- Construction hours installedNeed for walking, drilling, high-space work or tips.
- Testing and certificationFunctional testing, review, preparation and delivery of certificates.
- Sector-related costsDepending on the nature of the project (if applicable).
Main variables affecting amount
| Factors | An explanation |
|---|---|
| Area and floor | The greater the size of the area, the more the building and the larger the number of devices and hours worked |
| Type of system | The gap is very wide with only alarm appliances and concurrently involving automatic sprinkler, kitchen or gas fire extinguishing |
| Property uses | The higher risk of restaurant, factory, dangerous stores, etc., requires more stringent requirements |
| On-site conditions | Cyber flower forms, pipeline routes, water supply and electricity sources, structural constraints |
| Construction hours | Non-commercial or night work will affect the cost of working hours |
| Product specifications | Different specifications and brand prices |
| Whether remedial work is included | Annual inspection costs generally do not include replacement parts |
Because the variables are too large, our approach is to obtain information on addresses, uses, areas and existing devices (with plans or a previous FS251 better), arrange site surveys where necessary and provide a case-by-case approach.fire engineering "。
What is the cost of annual fire safety inspection? How can money be compared with annual fire safety inspection?
General
- Inspections and functional tests of the devices (detection detectors, warders, emergency lighting, copper, fire extinguisher etc.)
- System functional test and record test results.
- An electronic copy of the certificate is to be prepared and submitted electronically to FS251.
- Provide a list of devices and records of defects.
- Simple cooking and cleaning during the inspection (concept clause).
General calculations
- Replacement of damaged components (detection detectors, lamps, sprinkler head, fittings, etc.).
- Fire extinguisher for medication, replacement and pressure tests within five years (to confirm whether they have been included).
- Large-scale maintenance or system upgrading.
- Non-operation time or night overtime and attendance.
The difference is not comparable if the counterpart is required to disaggregate the costs of copper inspection, remedial work (by piece), attendance and time, certificates and documents, pressure tests, maintenance contracts by six items. Remedial work is reported only at low inspection costs and is considered entirely more expensive. Details of the compositionfire engineering services: cost composition and " modalities。
fire engineering is it possible to pay instalments?
The general practice of the market is to make payments in stages on schedule of work, such as payment of orders at the time of the contract, interim payments during the construction period, completion of testing and acceptance inspection, and payment of tailings; Specific ratios and milestones should be specified in the contract. It was suggested that three points should be left: it would not be appropriate to make a full payment; (a) Retention of reasonable ends until completion of tests or acceptance inspection; Require formal contracts and receipts, with a clear indication of the scope of the work, timetable and terms of payment.
VIII. How to select the contractor
What should the company reconcile fire engineering?
- Fully covered by registration level: List of first-hand devices, against levels 1, 2 and 3; The level and status of nuclear registration can be checked to the Fire Services Department.
- Completed in the electronic system FS251: The certificate has been fully electronic and must be submitted after the signature of a smart or Hong Kong e-mail certificate.
- " Classification of inspection fees and remedial work: Avoiding a large number of additional ex post facto amounts.
- List and record of defects in the provision of devices: The basis for future comparison, handover and budget.
- Copy with the construction period: Includes alarm segregation and rehabilitation procedures, water-free notices and work permit arrangements.
- Separating statutory and recommended items: What needs to be done and what should be recommended for improvement.
- Date of annual inspection initiated: Avoiding lateness.
Visible No.
- It is not possible to produce registration information or level that does not cover your system.
- " Abnormally low but vague and large number of project writings are considered separately.
- Full payment is required.
- Commitments are clearly unwarranted for completion or presentation.
- It was claimed that the replacement could be arranged but would not be willing to indicate where the actual registered contractor had been built and the evidence given.
For the company ' s qualification statementWith regard to us: registration qualifications and level of service。
IX. Other common issues
Can fire safety equipment be purchased for themselves?
It is not recommended, and it involves installations, maintenance, repair or inspection of fire service installations in the premises, which must be carried out by a registered fire service installation contractor at the appropriate level. The risks of self-procurement include the fact that specifications are not necessarily consistent with the requirements applicable to the Service, lack of product certification or endorsement documents (subject to acceptance inspection), ambiguity in the system ' s corporate responsibility line, future maintenance and solid disputes, and potential failure to issue certificates reflecting validity. In the case of biased branding or formula, the contractor may be consulted for procurement.
Fire alarm bell, is there a constant miscalculation and is the system to be replaced?
Most need not. The common causes are concentrated in four: sequestration and refurbishing of aluminium, wet or gas oil flue pollution, ageing of the line or decoupling, as well as detectors dressed in inappropriate positions (e.g., close loopholes). The correct approach is to identify the causes, clean-up or replacement of individual components, or to convert them into probability for the environment (e.g., conversion of kitchens to heat) rather than re-engineering mainframes. The direction of the processfire protection system maintenance。
Is the unit permanently vacant and is it still subject to annual inspection?
The legislation requires the owner to remain in an effective operational condition at the time of the fire service installations and to be inspected by a registered contractor at least once every 12 months, without being exempted from air. Batteries, pharmacists and lithiums in substantive units are similarly depressed over time, and long-term failure to check often leads to a large number of remedial work.
What should be the first to look for a fire safety direction?
Pre-resolution: fire service installations or equipment may be directed to Fire Services Department 2272 9112 (e-mail fsdbisc@hkfsd.gov.hk); Safety construction can be done to the Ivory Office 2626 1616. Accredited contractor is also scheduled for the on-site assessment programme, work period and budget. In the case of old industrial building, it may relate to the Safety (Industrial Buildings) Regulations (Chapter 636) - which entered into force on 19 June 2020 and which were set up in two phases for the targeted industrial buildings that were either on or before 1 March 1987 or submitted their construction plans for the first time (around 440 acres and an estimated 780 aluminium), Fire Services Department improved the fourth floor in 2023. Comparative regulationsImprovement of the old building: how to resolve applicable regulations。
Can the old building replace traditional devices with new technologies?
Part of the situation is possible. Fire Services Department issued Fire Services Department circular No. 3/2026 on 30 April 2026, which accommodates six layers of integrated use and residential buildings under the fire safety (buildings) Ordinance (Chapter 572) to replace the mandatory fire control system with a pallet network fire detection system fitted by hand fire extinguisher; The system has also been included in the scope of funding for fire safety improvement projects. Under the Governance Report 2026, Fire Services Department will expand its application to the old buildings of seven or more by the end of the year. The application must still be confirmed on the basis of individual buildings and Fire Services Department ' s request for detailsfire safety information: 2026 latest regulatory developments。
Extended reading
Is there any doubt? Delivery to us of addresses, uses, areas, information on existing devices and the last FS251, free access assessment and"ation; Emergency repairs can directly result 2667 7701 or WhatsApp 90114454。