Grand United Eng., Co.
Fire Engineering Services
I, II, Class 3fire service installations, byfire protection system design、fire protection system installed、fire protection system change、fire protection system maintenancetofire equipment maintenancewith statutory provisionsFS251 Annual InspectionThis can be followed up jointly by a team. Service coverageall 18 districts of Hong Kongshop, restaurant, office, industrial dams, schools, buildings, residential estate and data centres. Needsfire engineering "Electrical power 2667 7701 or WhatsApp 90114454。
Service overview
General services and level of registration
Hong Kong ' s fire service installations are regulated. (c) The fire safety (container ) Ordinance (Chapter 95A) divided the registered fire service installation contractor into grades 1, 2, 3 (commonly known as RC1, RC2, RC3); The Safety of Fire (Education and Equipment) Ordinance (Cap. 95B) specifies that non-registered contractors shall not be allowed to install, maintain, repair or inspect fire service installations or equipment at any place. The first check, therefore, was whether the level covered the entire system of your site.
| Services projects | Work covered | Level of registration |
|---|---|---|
| fire protection system design and plans | Programme design, specifications, plans for cooperation, documentation preparation | Construction scope in line with step 1/2/3 |
| Automatic sprinkler systems | Design, installation, re-routing, sprinkler head replacement, testing | Level 2 |
| Fire alarm systems | Detectors, mobile alarm points, mainframes, seconds, links | Level 1 |
| emergency lighting and export instructions | Installation, electrical discharge testing, replacement of batteries and lamps | Type 1/2 by nature of the device |
| fire hose reel and fire safety ⁇ | Installation, ballast testing, plumbing and refurbishing | Level 2 |
| gaseous fire suppression system | FM-200, CO2 systems installation and maintenance | Level 2 (Interpol I 1) |
| Automatic fire suppression system for kitchens | Pumps, wind and helmet areas protection, replacement of pharmaceuticals | Level 2 |
| Construction of fire pump | Predators, backups, ballasts, water pumps, control diskettes | Level 2 |
| Mechanical ventilation and building lift pressure | Wind, wind, wind, control and testing | Level 2 (relating to level 1) |
| Motivated fire-proofing devices | fire door, ventilated flame-resistant, fire-proofing and coating | By nature of the device; Complementing construction requirements |
| Extinguisher and fire extinguisher annual inspection | Supply, inspection, conversion of medicines, pressure test arrangements, replacement | Level 3 |
| Maintenance, annual inspection and remedial work | Weekly annual inspection, defective remedial work, review, issuance and delivery of FS251 | Level 1/2/3 |
One site is often cross-grade: for example, restaurant with a kitchen, fire alarm bell and detector is Class 1; sprinkler is the water pipe of the fire fighting system at level 2; handcuff fire extinguisher; and fire blanket is Level 3. The same team is jointly responsible for the completion of inspections at the same time, and all defects and remedial work recommendations are listed in the same record. Details of the definition of levelfire safety knowledge: RC1/RC2/RC3 division of labour。
Design
fire protection system design and plans services
Service content
We have developed fire service installations programmes, including types and locations of devices, equipment specifications and models, pipelines and line routes, and interface coordination with other electrical systems, as required by industry use, size, building, mobility and applicable legislation. The technical basis is based on the current version of the Fire Services Department ' s Code of Conduct and Inspection, Testing and Maintenance of Equipment and the Building Safety Code 2011 (Revised 2024).
Plans and division of documentation
Construction plans involving new or modified buildings are generally submitted by Authorised Person (AP) to the relevant authorities; After the approval of the plans by the Department of New Engineering, Authorised Person was informed that he received a certificate of fire safety from the construction plan (F.S. 161). The safety of fire involving a licence site is regulated by arrangements with the devices, which are handled by the applicant in conjunction with the registered fire service installation contractor. We are responsible for the programme, specifications and construction of the fire service installations component and cooperate with the submission of Authorised Person, licence consultant or fitting designer.
Four of the most worthy of processing during the design phase
- The flower form and height: directly affects sprinkler head, type of selection, coverage and location of detectors.
- Spacing and number of rooms: impact clocks and need for additional devices.
- Windwards and machine lines: avoiding conflict with fire safety piping, reducing the re-engagement.
- Enrolment and dressing: common sprinkler head and exit sign.
Consultants
fire safety consultants and risk assessment services
Service content
We look at the situation of fire service installations in the existing property industry, identify shortcomings and potential risks, and make enforceable improvements and budget proposals. The team of consultants is familiar with the requirements of the Safety of Fire Services Regulations (Chapter 502), fire safety (buildings) Ordinance (chap. 572) and the Safety (Industrial Buildings) Regulations (chap. 636), which can assist in dealing with the safety of fire issued by the Fire Services Department or the Housing Authority.
Frequent consultancy landscape
- Pre-lease assessment:: Determination of the adequacy of existing units and how responsibility for fire safety in leases is divided.
- Information received on safety:: On a case-by-case basis, resolution of the scope of fire service installations (Fire Services Department) or fire safety and security construction (Secondation Service) to develop programmes.
- Use change: The conversion of offices to catering, the conversion of warehouses to self-help warehousing, etc., may trigger a water density, separating and evacuation design re-examination.
- Industrial building, decentralized: Consensus-building is first developed and expenditure is controlled on a phased basis.
- Annual inspection pre-clearing inspections:: Early identification of defects and avoidance of significant remedial work at the annual inspection date.
Official search channels
Fire Services Department 2272 9112 for fire service installations or equipment (e-mail fsdbisc@hkfsd.gov.hk); Fire safety is provided with electricity for the construction of safe houses 2626 1616. Comparison of the scope of application of regulationsScope of services: fire safety in old buildings。
Water fire extinguishing
automatic sprinkler system ( ⁇ water systems)
System rationale
The automatic sprinkler system (Sprinkler System) is one of the most effective fixed fire-fighting devices. When sprinkler head feels fluctuated by an increase in temperature, local water stifle fires and triggers water flow alarms are used to elicit time for people to escape. Under applicable regulations, the designation of commercial premises, industrial buildings and integrated-purpose buildings may require the provision or improvement of automatic spraying systems, such as the common requirement under chapter 636 for old industrial building is the installation of automatic sprinkler system.
Our services
- Design and installation: Wet, dry, pre-reliant system type selection, piped route and refurbishing planning.
- Pipeline re-engineering and construction: Connecting improvements and spacing to maintain original design cover intentions.
- sprinkler head replacement: treatment of transformation, oil-contaminated or painted cover, leakage and copper issues.
- Testing and maintenance: Waterflow alarm test, folder examination, annual inspection and defect record.
The three most common deficiencies
- sprinkler head is underwater cover by new day flowers, billboards, plutonium or wind tubes.
- Excessive dumping of goods has an impact on the distribution of dams (in particular, warehouses and mini-storage).
- sprinkler head is covered by oil from paints or chickens, and thermometer is not measured.
Upon spacing of refurbishment or change, coverage must be reassessed and carried outfire protection system change。 System-wide knowledge is detailedfire safety: fire protection system maintenance element。
Detection alarm
Fire alarm systems
System rationale
fire alarm system is the first line of safety fire: early detection of fire with smoke detector, heat detector or fire detectors and notification of evacuation through fire alarm bell or alarm devices; Hand-held fire alarms were activated by handcuffed glass. The two are usually co-located with a set of control mainframes and clocks, and can be linked to wind, gate or gaseous fire suppression system.
Our services
- Design and installation: traditional alarm system, hand-held fire alarm system, and architectural system (which can indicate trigger points for positioning).
- Scope of the device: detectors, mobile alarm points, fire alarm bell and alarm devices, control of mainframes, back-up power sources, connections.
- Testing and maintenance: road completeness, detector activation, sounding and cover, backup batteries, connecting functions.
- Laptops: main crash, short-circuit or road breaks, erroneous screening.
Type of detector: pyrotechnician and heat, respectively
smoke detector is more sensitive to early burns and applies to corridors, offices, rooms and guest houses; Heat detector is triggered by changes in temperature and applies to the location of flue gas or oil cigarettes, such as kitchens, car rooms, etc. The most common problem after refurbishment is the departure of an astronaut change order detector from the original design coverage.
Four major causes of error
- Storage and fitting of the renovator enter the detection room.
- Wet, gas or oil smoke contamination.
- The circuit is ageing or offshoring.
- Detectors are packed in inappropriate positions (e.g., close pit latrines or smoking areas).
Repeated re-engineering of the mainframe is not a solution. Sustained miscalculations tend to overlook alarms by users, but rather a real security risk, and should identify causes and adjust selection or location.
Evacuation light
emergency lighting and exit sign
System rationale
Emergency lighting lamps are automatically activated when normal electricity is interrupted with corridors, stairs and access; The exit sign indicates the location and direction of export escapes. Both rely on back-up batteries for electricity and the required latitudes and duration of continuous power supply are determined in accordance with the Fire Services Department Code applicable to the Service.
Our services
- Installation and replacement: including LED lamps to deal with the problem of lighting and begging.
- Electricity testing: confirmation of the ability of batteries to maintain the lighting time required by the applicable code.
- Replacement of batteries: The ageing of batteries is one of the most frequently listed deficiencies in annual inspection.
- Instruction reconciliation: Synchronization of the renovated export trail change.
Annual inspection common deficiencies
- Electricity testing failed to maintain the required time.
- The lamps are not sluggish, nickel or decorative.
- The plates were branded, blanked and mounted.
- The direction is not consistent with the actual escape route.
Product specifications and replacement considerationsfire safety products: emergency lighting and export instructions。
Water fire extinguishing
fire hose reel and fire safety stoves
System rationale
fire hose reel (Hose Reel) for initial rescue of persons present, usually located in easy-to-see locations such as corridors and stairs; The fire safety tumour (Hydrant) provides fire safety personnel with access to water, mostly in large buildings and industrial dams. Reliability of both depends on water pressure and flow, and thereforefire pump roomInterest-related.
Our services
- Installation: chicken and fire safety, water supply pipes, blankets and decals.
- Testing: Water pressure and water test, volcanic flux, valves and glass condition.
- Repair: inadequate water pressure, leakage of copper, old or fractured tubes, plume card residence.
- Annual inspection: Incorporation of weekly annual inspection coverage and document results as required by chapter 95B.
Use of premises
Partial tumours need to be used first by shattering glass or opening the doors, so that pre-empts must remain open. The pre-arrival movement of goods is one of the most frequently identified issues in the inspection, and one of the most vulnerable to zero cost improvement.
Special firefighting
gaseous fire suppression system
System rationale
The gaseous fire suppression system is used in clean fire extinguishers or nitrogen gases to cover unsuitable water sites, such as computer server room, data centre, telecommunications server room, distribution room, archives and storage rooms for valuable equipment. The design of the purification gas system requires pharmacies to complete their spraying within a very short period of time (the general use of nitrogen-type pharmaceuticals as the design target is approximately 10 ml), to remove residuals after fire and to reduce secondary damage to electrical equipment and sophisticated instruments.
Our services
- Type of system: FM-200 Cleaner Pharmaceutical System, Sex Gas System, CO2 carbon dioxide system.
- Installation: steel bottles and mounts, pipes and sprayers, control of interconnections and detectors, warning devices.
- Maintenance and inspection: steel bottle pressure or weight, plumbing and spraying, extension and alarms, connection tests.
- Extensive considerations: door windows and winds are to be closed when they are activated, otherwise the pharmacological concentration cannot be maintained.
Gas releases are at risk to humans, in particular CO2 systems. The procedures for warning devices, extension functions, evacuation decals and personnel must be effective, while the maintenance process must also be strictly enforced to avoid misdeactivation.
Catering sites
Automatic fire suppression system for kitchens
System rationale
The main risk of commercial kitchens is from the accumulation of fire and fats. The Automatic Fire Eradication System (ATM) provides detective and spraying devices in pumps, winds and helmet areas, releases fire extinguishers applicable to fuel fire and can link fuel supply to reduce the chances of spread along the flame.
Our services
- Installation and modification: spraying and detecting components are configured by lithium appliance and gas design.
- Maintenance and testing: brake tests, pharmacies, fuel cutbacks, spray cleaning.
- Accompanied recommendations: fire blanket and wet chemical-type fire extinguisher (European standard, category F, United States standard, category K).
- Open kitchens: assess whether sprinkler protection needs to be considered.
Oil filtering is equally critical to the regular clean-up of winds: it reduces the system ' s effectiveness and increases the risk of volcanic spread. Detailed information on catering requirementsScope of services: focus of works by industry typeandproject examples: restaurant fire engineering。
Water core
Construction of fire pump
System rationale
The fire pump is at the core of building fire safety and water supply, responsible for providing sufficient water pressure and water for automatic sprinkler system, fire safety tumours and fire hose reel, generally including fire safety mains and backups, snow-match (Jockey Pump), water pumps, kitchens, control lists and associated fittings. The design and installation must be in compliance with the Fire Services Department code and applicable technical standards, as well as with the water supply interface requirements of the Water Authority; Any fire service installations involving the need to receptive to government water pipes is also required in the acceptance inspection document, either the notification of completion of water supply equipment or part IV of the Water Authority ' s table WWO46.
Our services
- Installation: main copper and back-up, structuring, water pumping, plumbing and fittings, control of disciplining.
- Testing: operational testing, pressure and flow, automatic activation and switching, alarm signals.
- Maintenance: water leakage and vacour inspection, control of a state of snow, power supply and backup, plating water and ventilation.
- Environmental inspection: whether the pit lanes were occupied, whether they were well marked and whether the flame-resistant separations were complete.
Three of the most often ignored
- The control of the lithium is long-term to handcuffed or closed, resulting in an inability to activate fire automatically.
- The kitchens were treated as impurities, and access and renovation space were occupied.
- Water pumps or recharge devices are unusual and have not been detected for a long time.
Smoking control
Mechanical ventilation and building lift pressure system
System rationale
The mechanical ventilation system was launched in the course of fire, freeing smoking from high temperature gases; The increase in the gradient (branch winds) has been delivered to absconded building to prevent smoking invasion and maintain visibility and usability of the escape path. Such systems are often found in large business sites, hotels, theatres and car parks.
Our services
- Installation: ventilation machines, smoking ventilates, winds, smoke damper and ventilated fireproof.
- Storage of the building: craft and wind, pressure and door-to-door enlightened scrutiny.
- Control and connectivity: connecting, handing and automatic model testing with fire alarm system.
- Periodic tests: operation of the wind crane, cycling and relaying, control signals.
Smoking ventilation was refurbished as a common problem, in particular after the commercial shop had been handcuffed or the building of a storage house, which must be reviewed together.
Motivated fire prevention
fire door, fire-proofing and flame-resistant tremors
Service content
- fire door: Installation and repair, closed gates and five gold, door and seals, self-executed functional tests.
- Typhoon-resistant fire and firefighting: Conduct testing, association with the alarm system and reconfirmation.
- Fire-resistant and fire-proofing coatings: Screening and retrofitting to deal with situations of lapse or defection covered by refurbishment.
- Improved access to fireRemoval of blockage, improvement of lighting and marking in the building, and five-pronged repairs to the export gate.
The most common violations: fire door was opened
The use of wooden pumps, plating blocks or impurities for prolonged fire doors would render the entire fire-fighting design ineffective and is one of the most common and most serious shortcomings in the cruise. If opening is necessary for ventilation or movement, the required device should be reused rather than a long-term fixed man.
Handheld equipment
Charge fire extinguisher supply, fire extinguisher annual inspection and substitution
Service content
Fire extinguisher is the most common initial fire-fighting tool, and almost all commercial offices, industrial buildings and public places are subject to appropriate quantities and types. Hand-held equipment is covered by a registered fire service installation contractor at level 3, and we provide supply, configuration advice, inspection, substitution, pressure test arrangements and replacement services.
Legal and code requirements
According to the Fire Services Department ' s Code of Conduct for Inspection, Testing and Maintenance of Minimum Fire Service Facilities and Equipment, such fire extinguisher should be tested every 12 months, while all fire extinguisher must undergo a stress test within five years. The inspection will then be marked by the date of inspection to allow for tracking the next due period.
Selected elements
- Dry powder: A, B and C are applicable to the broadest coverage and residues need to be cleared.
- Carbon dioxide: applicable to categories B, C and suitable for server room and sophisticated equipment; Closed space is sensitive to the risk of absconding.
- foams: A, B; Electricity is not available for use in electrical appliances.
- Acquisition: limited to A; It is not possible to use oil or electrical fire.
- Category wet chemical: palliative oil fire (Eurostat F/US Standard K) in conjunction with the kitchen system.
Detailed comparisons and maintenancefire safety knowledge: fire extinguisher annual inspection and substitution of medicineswithfire safety products: selected by type of fire。
Change
fire protection system change
What needs to be changed
- Changes to sprinkler head high and cover, detector position.
- Spacing or room building: impact detection coverage and soundness may require additional devices.
- Changes to wind or electrical power: conflict with fire safety pipe, or impact on ventilation paths.
- New signboards, sticks, mounts: sprinkler head or exit sign.
- Use change: For example, warehouses are converted to a warehousing warehouse and office meals, which may trigger the re-examination of water density and evacuation design.
The right order of construction
- The design phase begins with the identification of fire service installations and piping routes.
- The flower was sealed only after the completion of the daylight and walking line.
- The pre-closing photography records conceal the pipe location and facilitate subsequent maintenance.
- Post-completion testing and updating of the list of devices.
The completion of such fittings is to deal with fire safety and usually involves the dismantling of day flowers, with the highest cost and duration. Early intervention is the most direct method of provincial money.
Maintenance
fire protection system repair and malfunction
Common malfunctions and treatment
| Conquestion | Common causes | Orientation |
|---|---|---|
| fire alarm bell cascade | (b) The detector ' s accumulate or be affected by wet and gas; (a) The ageing of the line; Inadequate position | Clearance or replacement of detectors, check-ups, adjusting selection or location |
| The mainframe showed the breakdown | Removal of roads or short-circuits, backup batteries recession, model failures | Screening of circuits, replacement of battery or model |
| sprinkler leakage | sprinkler head, collision, laptop and corrosion of pipe | Replace sprinkler head or interface, local change management |
| Deficient water | Insufficient water pressure, unfavourable tumours, abnormal grouping and blocking of pipelines | Screening of lithium and pumps, testing of water pressure, cleaning pipe |
| emergency lighting, i.e., power cuts | Battery ageing or damaged, recharge circuit failure | Replacement of batteries or set of lamps |
| exit sign without sign | Elderly, electrical or batteries | Replacement of lamps, checking of power supply |
| Leave voids or water leakage | Wealding, bad hearts and leakage of copper | Maintenance or replacement of spare parts, re-education |
| Gas systems warning anomalies | Pressure or insufficient weight, detection or control of discrepancy | Inspection of steel bottles, control disciplining and connection, supplemented or replaced as necessary |
Upon maintenance, repairs or inspections shall be issued in accordance with Chapter 95B FS251 and delivered within 14 days to Fire Services Department.
Maintenance and annual inspection
fire equipment maintenance, FS251 annual fire safety inspection and remedial work
Quorum requirements
The owner of fire service installations and equipment is required to remain in an effective operational condition at the time of the installation, and at least once a 12-month period will be inspected by registered fire service installation contractor (chap. 95B).annual inspection of fire service equipment); Contractors are required to send to the person entrusted with the work within 14 days of completion of installation, maintenance, repair or inspectionFS251 Certificate of Fire Service Installations and EquipmentCopies were sent to Fire Services Department and non-compliance with statutory requirements could be prosecuted. Please note that FS251 is a certificate of laptop rather than a report box, issued by the contractor.
Full electronicization of certificates
The Fire Services Department ' s FS251 online submission system, which operates on 1 April 2019 and is fully implemented as of 1 July 2026: the contractor enters into the system the address, type of installation, inspection results, damage and repairs of the building to facilitate mentality or upon completion of electronic signature by Hong Kong e-mail certificate and produces an electronic certificate with a counterfeited dividing code. The Fire Services Department has also expanded the size of spot checks on copper annual inspection checklists by about three times, covering approximately five active contractors, thus making it more important than ever to check and complete records.
Annual inspection scope
- automatic sprinkler system : aluminium, water flow alarms, sprinkler head condition and profile.
- fire alarm system: detector activation, sounding, mainframe and backup power supply, connection.
- emergency lighting and export instructions: electric discharge testing, caring and direction.
- fire hose reel and fire safety plutonium: water pressure and water, chicken tubes and cartridges, chromosomes and decals.
- fire pumps and ballast: operation, pressure, control of cables and power sources.
- gaseous fire suppression system : pressure or weight, pipes and sprayers, links and alerts.
- Shanded fire extinguisher and fire blanket: pressure, pharmacies, seal lead, marking and ranking.
Annual fire safety inspection remedial work and review
When the defects are detected, we will be divided into immediate risks and platoonable projects and provide a case-by-case projectremedial work" : fire extinguisher switch or replacement, repair of fire alarm bell and detector, replacement sprinkler head, replacement of emergency lighting batteries and exit sign, restoration of kit and water pressure issues, etc. Upon completion of the rehabilitation and review, FS251 reflecting the actual situation was issued.
Benefits of maintenance contracts
- The date of the annual inspection is a reminder from our initiative to avoid its lateness.
- The list of devices and the records of defects are accumulated annually, with faster judgement being judged.
- The budget for remedial work may be organized by a legal or corporate financial year.
- Multiple or locked shops can harmonize their formats and schedules.
Request for annual fire safety inspectionMaintenance and annual inspection detailsAnnual compliance calendar
Fees
Type of fees
「Annual fire safety inspectionCopper and copperfire engineering "There is no uniform price for copper, as the same sentence carries fire safety, which may be checking, remedial work, maintenance, modification or full new installation. Our approach is to be clear-cut in nature and to be specified on a case-by-case basis.
| Factors | An explanation |
|---|---|
| Type and quantity of devices | Number of fire extinguisher, sprinkler head, number of detectors and police clocks, emergency lighting and number of exit signers, footwear and chickens. |
| In relation to the registration level portfolio | Only hand-held fire extinguisher (level 3) differs significantly from the workload associated with alarm (grade 1) and sprinkler, plutonium, cascade (class 2). |
| Area and floor | Multiple layers of property, industrial building units, large business sites need to be more long-serving than others. |
| On-site conditions | Astronomy, piping routes, water supply and electricity sources, need for high-space work or tying. |
| Construction hours | Commercial sites, restaurant, schools often require non-commercial or night work to avoid impacting on operations and alarm error. |
| Whether remedial work is included | Annual inspection costs generally do not include replacement parts; Alternatively, sprinkler head, battery and direction light. " |
| Status of records | If a long list of maintenance or devices is lacking, additional time will be required for the first year to count and establish records. |
| Documentation and testing arrangements | Need for plans, test reports, acceptance inspection coordination or follow-up of certificates. |
Please provide information upon request
- Address and object uses (shop , restaurant, office , industrial building , residential estate, etc.).
- Area and floor, and whether it relates to the public utility component.
- Type and approximate number of existing devices.
- The last FS251 or installation list (if any).
- Fire Services Department, House Office or Management Service were notified.
- Time limits, such as business days, licence or duration of renewal.
We ' s " Separating statutory requirements and recommendations to improve the veils and specifying fees for inspection and remedial work; The site survey will then be preceded by a separate " confirmation of construction " if additional work is required.
Process
Cooperation process: from consultation to year maintenance
- Reference and preliminary judgement: Understanding material and timelines, resolution of annual inspection, remedial work, maintenance, modification or new loading.
- site survey:: Verification of the type of device, related to grades, flowers and spacing, construction corridors and time frames available.
- Programme and ": The system programme, material specifications, inspection fees and remedial work costs are specified on a case-by-case basis.
- DocumentationPreparation of plans and documents as required, in conjunction with Authorised Person, licence department or administration.
- Construction arrangementsPhased construction to deal with alarm sequestration and reinstatement, water-free notices and work permits.
- Testing and acceptance inspectionFunctional testing and review to confirm the response to an effective operational condition.
- Certificates and records:: Issuance and electronic submission of FS251 for a statutory period, the list of delivery devices and records of defects.
- Annual follow-upRecord the next annual inspection date and arrange regular maintenance as required.
Practical arrangements and case studies for various types of propertyProjects; Area and type of clientService coverage。
FAQs
Frequent issues of services
What levels of fire service installations are you undertaking?
I. II. Class 3 Cocoa. (a) Level 1 for detecting cigarettes or fires and issuing alarms; Level 2 - Plutonium and other electrical installations for the transmission of water or other fire extinguishers (except hand-held equipment); Level 3 refers to hand-held equipment. See tableTotal service and level。
Who submits fire safety plans?
Those involved in building construction plans are generally submitted by Authorised Person (AP) and, with the approval of the new Engineering Department of Fire Services Department, the authorised Person was informed of the fire safety certificate of the construction plan (F.S. 161); The fire safety of the licence site is handled by the applicant in cooperation with the registered contractor. We are responsible for the fire service installations and cooperate with them.
Is it necessary to make a fire protection system change?
Changes affecting sprinkler ' s coverage, location of the detector, velocity or visualization of an instructional light must be processed and registered with the contractor at the corresponding level for construction. For further detailsfire protection system change。
What are the statutory requirements for annual fire safety inspection?
At least once every 12 months, the contractor is checked by a registered fire service installation contractor who will be required to send FS251 to the client within 14 days of completion and send a copy to Fire Services Department.
FS251 How do it present?
Submitted electronically by Fire Services Department; The system operates on 1 April 2019 and is fully electronic as of 1 July 2026 and produces an electronic certificate with a two-dimensional code.
Frequency of fire extinguisher inspection and stress testing?
Every 12 months should be tested and all fire extinguisher must undergo a pressure test within five years. Hand-held equipment is subject to level 3, as detailedShand fire extinguisher services。
How can the annual fire safety inspection be calculated?
Depending on the number of devices, size combinations, size floors, site conditions, duration of construction and whether remedial work is included. Table of compositionComposition of fees。
Annual fire safety inspection by side?
(a) The person who is legally responsible for the installation; Most of the public use is arranged by a legal regiment or management firm, with internal units and fire extinguisher being held by tenants or operators under lease.
What is not the case for an annual inspection?
FS251, reflecting the actual situation, was issued only after completion of remedial work and review. Common remedial work project seeMaintenance, annual inspection and remedial work。
What is the difference between acceptance of new buildings and annual inspection?
The acceptance inspection of new buildings is linked to the occupancy licensing process, pursuant to article 21(6)(d) of the Buildings Ordinance (Chapter 123), and Fire Services Department issued FS 172 to non-governmental buildings upon confirmation; The annual inspection is a 12-month check under Chapter 95B and issued FS251. Comparativeproject examples: acceptance inspection and certification process。
Could only be a single system or one-time maintenance?
It is possible. A single-system-based interface can also provide a unified treatment of three levels for the same site, reducing coordination and certification gaps.
Is it possible to work at a non-commercial time?
It is possible. We will deal with alarm sequestration and reinstatement, water-free notices and work permit arrangements, which will be set out in " .
Extended reading
Relevant page fast-tracking
Services and scope
Products and knowledge
Case and company
Need for fire engineering " or FS251 annual fire safety inspection?
The first, second, class 3 fire service installations are performed by plans, installation, modification, maintenance to annual inspection and remedial work one-stop follow-up, with certificates being submitted electronically to Fire Services Department within the statutory period.