The Fire Retardant Paint Process Explained: 12 Steps from Site Assessment and Application to FS251 Electronic Certificate
Once you have decided to apply fire retardant treatment to false ceilings, timber partitions or curtains, the next questions are usually: "How does the whole process work? What do I need to prepare? When will I receive the FS251?" Fire retardant paint work may look like ordinary painting, but every step, from assessment, material checks and surface preparation to application control, certificate issuance and submission, affects whether the work will pass Fire Services Department (FSD) inspection. This guide breaks the full process into 12 steps and explains each party's responsibilities and the new arrangements following the move to electronic FS251 certificates in 2026.
Quick answer: The basic process is for a Class 2 Registered Fire Service Installation Contractor to assess the materials, confirm the use of a product accepted by the Director of Fire Services, apply it according to the product requirements before the materials are painted or assembled, and then, within 14 days of completion, prepare, electronically sign and submit the FS251 through the FSD's online system. From 1 July 2026, the FSD only accepts FS251 certificates submitted electronically, and certificates carry an anti-counterfeit QR code.
Contents
- Process overview
- Who is responsible for what
- Before the work: steps 1 to 5
- During the work: steps 6 to 9
- After the work: steps 10 to 12
- New arrangements for electronic FS251
- How to verify contractors and certificates
- Handover checklist
- The most common problems in the process
- Frequently asked questions
1. Process Overview
The fire retardant treatment process can be divided into three stages, before, during and after the work, with 12 steps in total:
| Stage | Step | Main responsibility |
|---|---|---|
| Before the work | 1. Confirm FSD requirements | Owner / tenant |
| 2. Compile a material list and existing reports | Owner, fitting-out contractor | |
| 3. Site assessment | Registered contractor | |
| 4. Confirm quotation and product | Owner, registered contractor | |
| 5. Coordinate the work schedule | Fitting-out contractor, registered contractor | |
| During the work | 6. Surface preparation | Registered contractor, fitting-out contractor |
| 7. Brushing or spraying | Registered contractor | |
| 8. Drying and follow-on work | Registered contractor, fitting-out contractor | |
| 9. Work records | Registered contractor | |
| After the work | 10. Completion check | Registered contractor, owner |
| 11. Issue and submit the FS251 | Registered contractor | |
| 12. Filing documents and FSD inspection | Owner / licensee |
If you are not yet clear on what fire retardant paint does and which materials it suits, start with What Is Fire Retardant Paint? Principles, Types and Hong Kong Fire Safety Requirements. For material standards, see BS 476 Part 7 Class 1 vs Class 2.
2. Who Is Responsible for What
Many delays happen because each party assumes "the other side will handle it". The table below sets out each party's responsibilities in a typical project:
| Role | Main responsibilities |
|---|---|
| Owner / tenant / licensee | Understand the FSD's written requirements, appoint a qualified contractor, provide premises information, keep certificates and test reports, and ensure any alterations during the licence period also comply |
| Fitting-out contractor | Provide material specifications and test reports, schedule time for fire retardant treatment, avoid painting relevant materials before treatment, and coordinate work times |
| Class 2 Registered Fire Service Installation Contractor | Assess materials, select products accepted by the Director of Fire Services, apply them according to product requirements, issue the FS251 and send a copy to the FSD |
| FSD | Set fire safety requirements, review documents and carry out inspections |
The most critical coordination is the sequencing of work between the fitting-out contractor and the registered contractor. If the fitting-out contractor has already painted the timber, it becomes difficult to treat, and the whole process has to go back a step.
3. Before the Work: Steps 1 to 5
Step 1: Confirm FSD Requirements
Start by checking the written requirements issued by the FSD or the licensing authority to confirm which items need treatment. Fire safety requirements differ between restaurants, tutorial schools, places of amusement and other premises. Within the same letter, false ceilings, partitions, wall finishes and curtains may also be listed separately. Do not rely on a verbal understanding; work from the documents. For the legal background, see Hong Kong Fire Safety Laws and Regulations.
Step 2: Compile a Material List and Existing Reports
List all combustible fitting-out materials in the premises and record for each one:
- Material type, such as solid timber, plywood, decorative panels, drapes or carpet
- Location, such as the entrance wall, private room partitions or windows
- Approximate area
- Surface condition, including whether it is painted or topcoated
- Whether a test report already exists, and the standard and class it states
Materials that already have a valid test report, with the product and installation method matching what is on site, may need no treatment; simply keep the report as proof. Doing this step well directly reduces the treatment area and cost.
Step 3: Site Assessment
During a site visit, the contractor will generally check the following:
- Whether the materials are suitable for treatment and whether the surface allows the product to adhere or penetrate
- The actual area, by measurement
- Ceiling height and whether high-access equipment is needed
- On-site ventilation, power and water supply
- Whether the premises is open for business, and available working hours
- Whether other fire service installations need to be handled at the same time
If materials are already painted or have unsuitable surfaces, the contractor will recommend removing the coating, replacing the material, or switching to a material with a test report.
Step 4: Confirm the Quotation and Product
When confirming the quotation, make sure the following are clearly stated:
- Scope of treatment and area used for pricing
- Name of the product used, and confirmation that it is on the FSD's accepted list
- Whether the FS251 is included
- Name and registration number of the registered contractor issuing the certificate
- Work date, hours and any surcharges
- Cancellation and rescheduling terms
For quotation items and cost factors, see How Much Does Fire Retardant Paint Cost in Hong Kong?.
Step 5: Coordinate the Work Schedule
Fire retardant treatment should be scheduled after the materials are assembled but before painting or surface finishing. It is generally advisable to book about 2 to 3 weeks in advance. The fitting-out contractor should allow for this stage in the works programme and confirm the following with the registered contractor:
- Which works must be complete on site on the day of treatment
- Whether other trades need to pause during treatment
- How long to wait after treatment before painting or installation can continue
4. During the Work: Steps 6 to 9
Step 6: Surface Preparation
The result depends heavily on the surface condition. Typical preparation includes:
- Removing dust, wood shavings, grease and loose material from the surface
- Making sure the material is dry
- Covering areas not to be treated, such as floors, glass, electrical equipment and furniture
- Removing or covering items that could interfere with the work
For fabric, confirm that it has not been waterproofed or given a stain-resistant treatment, otherwise the fire retardant solution cannot penetrate the fibres.
Step 7: Brushing or Spraying
The contractor will choose brushing, rolling, spraying or misting depending on the material and product. During application, the following must be controlled according to the product instructions:
| Control item | Why it matters |
|---|---|
| Coverage per square metre | With insufficient coverage, the treated material may not reach the required class |
| Number of coats | Some products require several coats, each reaching the specified coverage |
| Interval between coats | Applying the next coat before the previous one is dry can affect adhesion and performance |
| Coverage of all areas | Corners, edges and back faces are easily missed |
| Environmental conditions | Temperature, humidity and ventilation affect drying time |
Different products have different coverage and coat requirements. Always follow the product instructions rather than relying on experience with ordinary paint.
Step 8: Drying and Follow-On Work
After treatment, allow the drying time specified for the product. If a topcoat or decorative finish is to be applied over the fire retardant paint, confirm that the topcoat is compatible with the fire retardant product and apply it as required, so that it does not affect how the fire retardant layer performs under heat. This should be agreed in advance between the registered contractor and the fitting-out contractor, not decided by the painters on their own.
Step 9: Work Records
A well-run contractor will record details of the work, such as:
- Date and location of the work
- Product used and batch number
- Area treated and quantity used
- Photos of the site before and after treatment
These records help with later inspections and give the owner a basis for confirming that the work is complete. Owners can ask the contractor for work photos for their files.
5. After the Work: Steps 10 to 12
Step 10: Completion Check
After the work is done, the contractor should check that all areas have been treated and confirm this with the owner or fitting-out contractor. The owner can check each location and area against the original material list.
Step 11: Issue and Submit the FS251
Under section 9(1) of the Fire Service (Installations and Equipment) Regulations (Cap. 95B), a Registered Fire Service Installation Contractor must, within 14 days of completing the relevant work, issue the FS251 to the person who instructed the work and send a copy to the FSD. From 1 July 2026, the FS251 must be prepared, signed and submitted electronically through the FSD's online system, as explained in the next section.
Step 12: Filing Documents and FSD Inspection
After receiving the FS251, the owner should file it together with the following documents:
- FS251 electronic certificate
- Material test reports
- Product information
- Quotation and invoice
- Work photos
These can then be produced immediately for FSD inspection or licence renewal. If materials are changed during the licence period, recheck them and keep the new documents too.
6. New Arrangements for Electronic FS251
In mid-2026 the FSD launched an upgraded online submission system for the Certificate of Fire Service Installations and Equipment (FS251). From 1 July 2026, it only accepts certificates prepared, signed and submitted electronically, replacing paper submission.
Main Changes Under the New Arrangements
| Item | New arrangement |
|---|---|
| Preparation | Contractors enter certificate details directly into the online system, including the building address, type of fire service installation, inspection results, defects and repair status |
| Signing | Electronic signature using "iAM Smart" or a Hongkong Post e-Cert |
| Submission | Submitted directly through the system, with data sent to the FSD in real time |
| Certificate format | After successful submission, the system automatically generates a formal electronic certificate with an anti-counterfeit QR code |
| Statutory deadline | Unchanged: issued and copy sent within 14 days of completing the work |
What This Means for Owners and Tenants
- Certificates are easier to verify: electronic certificates carry an anti-counterfeit QR code, reducing the risk of forged certificates.
- Data is filed in real time: the FSD can see certificate information immediately, so late or missing submissions by contractors are easier to spot.
- Certificates are received electronically: confirm with the contractor how you will receive the certificate, for example by email, and keep a backup.
7. How to Verify Contractors and Certificates
Verifying the Contractor
The FSD website has a "Registered Fire Service Installation Contractor (RFSIC) list search", where you can search by contractor name, registered address or registration number. Class 2 contractors have registration numbers beginning with "RC2". Before appointing a contractor, ask for the registration number and check against the list:
- Whether the contractor name matches the quotation
- Whether the registration class includes Class 2
- Whether the registration is still valid
Verifying the Certificate
After receiving the FS251, check the following details:
- Whether the premises address is correct
- Whether the description of work matches what was actually done
- Contractor name and registration number
- Whether the issue date is within 14 days of completion
- Whether the certificate carries an anti-counterfeit QR code
8. Handover Checklist
At completion, owners can confirm each item on this checklist:
| Item to check | Confirmed |
|---|---|
| All materials needing treatment have been treated, with locations matching the list | □ |
| Treated area matches the quotation | □ |
| Name and information of the product used have been received | □ |
| Before and after photos have been received | □ |
| FS251 was issued within 14 days | □ |
| Address, work description and contractor details on the FS251 are correct | □ |
| Certificate carries an anti-counterfeit QR code | □ |
| Contractor verified as a Class 2 registered contractor | □ |
| Test reports, certificate and invoice have been filed | □ |
9. The Most Common Problems in the Process
Problem 1: Arranging treatment after materials are painted
This is the most common and most expensive mistake. Once materials are painted, fire retardant products struggle to adhere or penetrate, and the coating often has to be removed or the material replaced. The solution is to list fire retardant treatment in the fitting-out programme as a designated step before painting.
Problem 2: Reports that do not match materials on site
If the model, thickness or installation method in a supplier's test report differs from what is on site, the report will not be accepted at inspection and fire retardant treatment will have to be done after all. Check reports at the procurement stage; see how to check a BS 476 Part 7 test report.
Problem 3: Missing some areas
For example, the walls are treated but the private room partitions or curtains are missed. Compiling a complete material list at step 2 avoids this problem.
Problem 4: Altering materials after treatment
Adding to, sanding or repainting materials after fire retardant treatment may make the original treatment ineffective. Consult the contractor before making changes.
Problem 5: Booking only when the inspection is near
Without enough lead time, the contractor may not be able to fit you in, or a rush surcharge may apply. Plan the timing of fire retardant treatment at the design stage.
Key Process Points for Different Premises
| Premises type | Key process points |
|---|---|
| New restaurants | Align with the licensing timetable, complete treatment before painting, and arrange it together with other fire service installations |
| Licensed premises in operation | Work outside opening hours, treat in stages, and protect existing furniture and equipment |
| Exhibition booths | Fit in with build-up times, and confirm the organiser's requirements and certificate submission deadline early |
| Schools and clubhouses | Avoid class or activity times, and handle large areas of fabric and partitions |
If your premises also needs its annual fire service installation inspection, see our Complete Guide to Fire System Maintenance and FS251 Annual Inspection. For other fire service installation and improvement works, see our Fire Engineering Services.
10. Frequently Asked Questions
How long does fire retardant paint work usually take?
It depends on the area, material, number of coats and drying time. Small shops or booths can generally be completed fairly quickly, while large-area or high-ceiling projects take longer. For booking, it is generally advisable to allow about 2 to 3 weeks in advance.
How soon after completion will I receive the FS251?
Under section 9(1) of Cap. 95B, the registered contractor must issue the FS251 within 14 days of completing the work and send a copy to the FSD. You can confirm the actual timing with the contractor when appointing them.
What has changed with the FS251 from 2026?
From 1 July 2026, the FSD only accepts FS251 certificates prepared, signed and submitted electronically by contractors through its online system. Contractors sign using "iAM Smart" or a Hongkong Post e-Cert, and after successful submission the system generates an electronic certificate with an anti-counterfeit QR code.
How can I confirm that a contractor is a Class 2 registered contractor?
Use the "Registered Fire Service Installation Contractor (RFSIC) list search" on the FSD website to search by contractor name or registration number. Class 2 contractors have registration numbers beginning with RC2.
Can the premises stay open during fire retardant paint work?
It is generally advisable to carry out the work outside opening hours, to avoid affecting customers and staff and to give the materials enough time to dry. Discuss the specific arrangements with the contractor.
Can a topcoat be applied over fire retardant paint?
Some products allow a compatible topcoat, but it must be applied according to the product requirements so as not to affect the performance of the fire retardant layer. The contractor should confirm the type of topcoat and application method.
If treated materials are later sanded or repainted, do they need retreating?
Sanding, repainting or altering materials may make the original fire retardant treatment ineffective. Consult the contractor before making changes; depending on the situation, retreatment and a new FS251 may be needed.
What documents should owners keep?
Keep the FS251 electronic certificate, material test reports, product information, quotation, invoice and work photos, ready to produce for FSD inspection or licence renewal.
Arrange Fire Retardant Treatment and FS251
Grand United Eng., Co. is a Registered Fire Service Installation Contractor in Hong Kong. We can handle the full process from material assessment and work scheduling to certificate submission, and coordinate with fitting-out contractors to reduce rework and delays. When you contact us, please provide the premises use, a material list, site photos, the fitting-out programme and any FSD letter of requirements. You can also browse our Project Cases, Service Coverage and FAQ.